You will be required to comply with the Code of Practice if you intend to have an on-site sewage & sullage treatment system in the Northern Territory. This Code applies to small-scale on-site wastewater systems with maximum design capacity of 8000 litres per day.
This Code was developed to assist the community and the industry, in ensuring that safe and effective septic tanks are installed and maintained throughout the life of the system.