Please submit your completed application form with:
- soil testing results
- a survey of the storage area to work out dam capacity
- a survey of biodiversity in the area (location dependent)
- a hydrological report with a water balance study
- engineering drawings detailing dam wall, spillway and outlet design
- a geotechnical report with soil tests, the dam wall foundations, the ability of the dam to store water and any potential for leaks
- an assessment of the downstream environment and vulnerability to flooding if the dam fails
- an Aboriginal Areas Protection Authority clearance certificate.