|
Apply
|
Application
|
All
|
$261.00
|
Fees for 2025-26
|
|
Apply
|
Application
|
All
|
-
|
Asphalt manufacturing:
- under 1000 tonnes of asphalt per annum - $207.00
- over 1000 tonnes of asphalt per annum - $2,646.00
Fees for 2025-26
|
|
Apply
|
Application
|
All
|
-
|
Plastic product manufacturing:
- manufacturing in a year, a total of 50 tonnes or more of plastic product, other than a plastic product mentioned below - $2,315.00
- manufacturing in a year, a total of 5 tonnes or more of carbon fibre, epoxy coating, foam, foam sandwich, mattings, resin, composite plastics or rigid fibre-reinforced plastics - $4,463.00
Fees for 2025-26
|
|
Apply
|
Application
|
All
|
$207.00
|
Metal forming. Fees for 2025-26
|
|
Apply
|
Application
|
All
|
-
|
Metal recovery:
- recovering less than 100 tonnes of metal in a day - $621.00
- recovering more than 100 tonnes or more of metal in a day, or 10,000 tonnes or more of metal product in a year, and carrying out the relevant activity without using a fragmentiser - $1,571.00
- recovering more than 100 tonnes or more of metal in a day, or 10,000 tonnes or more of metal product in a year, and carrying out the relevant activity using a fragmentiser - $4,216.00
Fees for 2025-26
|
|
Apply
|
Application
|
All
|
-
|
Surface coating:
- anodising, electroplating, enamelling, galvanising or using (1 to 100 tonnes), in a year - $827.00
- coating, painting or powder coating (1 to 100 tonnes), in a year - $207.00
Fees for 2025-26
|
|
Apply
|
Application
|
All
|
$1406.00
|
Boat maintenance or repair. Fees for 2025-26
|
|
Apply
|
Application
|
All
|
$207.00
|
Waste incineration and thermal treatment (incinerating or thermally treating waste vegetation, clean paper or cardboard). Fees for 2025-26
|