Apply
|
Application
|
All
|
$5.00
|
Hoarding and scaffolding permit within the CBD (per square metre per week). Minimum charge is $125.
|
Apply
|
Application
|
All
|
$40.00
|
Skip bin permit (per week).
|
Apply
|
Application
|
All
|
$125.00
|
Crane / concrete pump / cherry picker etc permit (per week).
|
Apply
|
Application
|
All
|
$300.00
|
Road closure fee.
|
Apply
|
Application
|
All
|
$370.00
|
Highway opening fee, per week.
|
Apply
|
Application
|
All
|
$190.00
|
Highway opening fee, minor works, per day.
|
Apply
|
Application
|
All
|
$4.00
|
Hoarding and scaffolding permit outside the CBD (per square metre per week).
Minimum charge is $125.
|
Apply
|
Application
|
All
|
$5.00
|
Long term construction, occupation of public highway within the CBD (per square metre, per week). Minimum charge is $125 per month.
|
Apply
|
Licence
|
All
|
$4.00
|
Long term construction, occupation of public highway outside the CBD (per square metre, per week). Minimum charge is $125 per month.
|
Apply
|
Licence
|
All
|
$350.00
|
Special event permit, per day.
|
Apply
|
Miscellaneous
|
All
|
$280.00
|
Road closure statutory advertising fee, per closure.
|